{"id":11250,"date":"2014-06-14T06:55:32","date_gmt":"2014-06-14T04:55:32","guid":{"rendered":"http:\/\/isar1.org\/documentation"},"modified":"2017-09-16T12:55:09","modified_gmt":"2017-09-16T12:55:09","slug":"documentation","status":"publish","type":"page","link":"https:\/\/isar1.de\/en\/planning-design\/documentation\/","title":{"rendered":"documentation"},"content":{"rendered":"<p><span class=\"first-letter\">I<\/span>t should be self-evident that building projects have a proper and thoroughly documentation after their completion. Unfortunately our experiences in facility management show, that this is still an illusion for a large part of building projects until today\u2026.<\/p>\n<p>Documentation? What documentation?<\/p>\n<p>The reasons for an incomplete or lacking documentation:<\/p>\n<ul>\n<li>The documentation was not part of the contract<\/li>\n<li>The project had a confusing structure<\/li>\n<li>The effort for collecting the relevant documents seems to high<\/li>\n<li>There is no coordinator or manager, who takes care of an accurate documentation<\/li>\n<\/ul>\n<section class=\"tm-main-bottom uk-grid\" data-uk-grid-match=\"{target:'&gt; div &gt; .uk-panel'}\" data-uk-grid-margin=\"\">\n<div class=\"uk-width-1-1\">\n<div class=\"uk-panel uk-panel-box widget_text\">\n<h4>A good documentation can be achieved through&#8230;<\/h4>\n<p>determination of project standards &#8230;. a contract for implementation of distinct documentation guidelines that are mandatory for everyone who is involved in the project &#8230; quality assurance of all data on a regular basis (documentation controlling) &#8230;. even if that is not required by the owner\/buyer &#8230; work-flow and elaboration due to internal documentation standards which were created specifically for this project &#8230;.<\/p>\n<p><strong>as a result you will have the certainty that you<\/strong><\/p>\n<ol>\n<li>are able to deliver economical and high quality standard projects &#8230;<\/li>\n<li>are able to avoid additional coordination which is time consuming and cost intensive &#8230;<\/li>\n<li>are able to pass these standards on to our clients with a well balanced budget &#8230;<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/section>\n<p><div>&#8220;The secret of getting ahead is getting started.&#8221;<span style=\"font-size: 10pt;\">(Mark Twain)<\/span><\/div>\n<\/p>\n<p>Consider the needs of the future operation company and user, who will be forced to collect all necessary data by themself, troublesome and time consuming.<\/p>\n<section data-uk-grid-match=\"{target:'&gt; div &gt; .uk-panel'}\" data-uk-grid-margin=\"\">\n<h4>isar1 ag &#8230;<\/h4>\n<ul>\n<li>always supervises every project according to internal and\/or external documentation standards<\/li>\n<li>always ensures a high quality of the issued documents trough internal QM standards<\/li>\n<li>verifies and resolves the needs for the project documentation with the customer and adjusts flexibly to their requirements<\/li>\n<li>creates CAD-, CAFM- and documentation guidelines on a 30 year experienced basis<\/li>\n<li>organises, implements and coordinates a documentation management and controlling<\/li>\n<li>optimises your relevant documentation processes<\/li>\n<li>integrates supporting tools for planning an documentation<\/li>\n<li>supports YOU in creating a documentation for existing buildings and already completed projects<\/li>\n<li>solves organisational and IT-technical problems between all participants and the used tools<\/li>\n<li>\u2026.<\/li>\n<\/ul>\n<\/section>\n<p><!-- {\"name\":\"\",\"type\":\"layout\",\"children\":[{\"name\":\"image\",\"type\":\"section\",\"props\":{\"width\":\"default\",\"padding\":\"xsmall\",\"style\":\"primary\",\"header_overlay\":\"\",\"animation\":\"\",\"text_color\":\"\",\"media\":\"images\\\/service-header.jpg\",\"image\":\"wp-content\\\/uploads\\\/library_02.jpg\",\"image_size\":\"contain\",\"image_position\":\"center-center\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"padding_remove_top\":false,\"padding_remove_bottom\":false,\"image_width\":\"50%\",\"image_effect\":\"parallax\",\"image_parallax_bgx_start\":\"400\",\"image_parallax_bgx_end\":\"800\",\"preserve_color\":true,\"css\":\"\",\"image_height\":\"\"},\"children\":[{\"name\":\"\",\"type\":\"row\",\"props\":{\"layout\":\",fixed\",\"fixed_width\":\"large\",\"breakpoint\":\"m\",\"gutter\":\"\",\"margin\":\"large\"},\"children\":[{\"name\":\"\",\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"widths\":[\"\"],\"image\":\"\",\"image_size\":\"contain\",\"style\":\"\",\"preserve_color\":false,\"padding\":\"large\",\"css\":\"\",\"text_color\":\"\"},\"children\":[{\"name\":\"Panel documentation\",\"type\":\"panel\",\"props\":{\"link_text\":\"Read more\",\"title_element\":\"h3\",\"meta_style\":\"meta\",\"meta_align\":\"bottom\",\"icon_ratio\":4,\"image_align\":\"right\",\"image_grid_width\":\"1-2\",\"image_breakpoint\":\"m\",\"link_style\":\"default\",\"margin\":\"default\",\"title\":\"documentation\",\"content\":\"\n\n<p><span class=\\\"first-letter\\\">I<\\\/span>t should be self-evident that building projects have a proper and thoroughly documentation after their completion. Unfortunately our experiences in facility management show, that this is still an illusion for a large part of building projects until today\\u2026.<\\\/p>\",\"image\":\"wp-content\\\/uploads\\\/library_01.jpg\",\"panel_style\":\"card-default\",\"image_card\":true,\"title_color\":\"\",\"css\":\"\",\"image_width\":\"360\",\"image_height\":\"360\",\"class\":\"uk-fifth\"}}]},{\"name\":\"\",\"type\":\"column\",\"props\":{\"widths\":[\"fixed\"],\"image_position\":\"center-center\",\"image\":\"\",\"style\":\"\"}}]}]},{\"name\":\"Your projects\",\"type\":\"section\",\"props\":{\"width\":\"default\",\"padding\":\"\",\"style\":\"default\",\"header_overlay\":\"\",\"animation\":\"\",\"image_size\":\"cover\",\"image_position\":\"center-center\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"padding_remove_bottom\":false,\"padding_remove_top\":false,\"image\":\"\"},\"children\":[{\"name\":\"\",\"type\":\"row\",\"props\":{\"layout\":\"2-3,\",\"gutter\":\"\",\"breakpoint\":\"m\",\"fixed_width\":\"large\"},\"children\":[{\"name\":\"\",\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"widths\":[\"2-3\"]},\"children\":[{\"name\":\"\",\"type\":\"headline\",\"props\":{\"title_element\":\"h3\",\"title_style\":\"h3\",\"title_decoration\":\"\",\"text_align\":\"\",\"text_align_breakpoint\":\"\",\"text_align_fallback\":\"\",\"maxwidth\":\"\",\"maxwidth_align\":\"\",\"margin\":\"\",\"animation\":\"\",\"visibility\":\"\",\"content\":\"Documentation? What documentation?\"}},{\"name\":\"\",\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>The reasons for an incomplete or lacking documentation:<\\\/p>\",\"text_style\":\"lead\"}},{\"name\":\"\",\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<ul>\\n\n\n<li>The documentation was not part of the contract<\\\/li>\\n\n\n<li>The project had a confusing structure<\\\/li>\\n\n\n<li>The effort for collecting the relevant documents seems to high<\\\/li>\\n\n\n<li>There is no coordinator or manager, who takes care of an accurate documentation<\\\/li>\\n<\\\/ul>\\n\n\n<section class=\\\"tm-main-bottom uk-grid\\\" data-uk-grid-match=\\\"{target:'&gt; div &gt; .uk-panel'}\\\" data-uk-grid-margin=\\\"\\\">\\n\n\n<div class=\\\"uk-width-1-1\\\">\\n\n\n<div class=\\\"uk-panel uk-panel-box widget_text\\\">\\n\n\n<h4>A good documentation can be achieved through...<\\\/h4>\\n\n\n<p>determination of project standards .... a contract for implementation of distinct documentation guidelines that are mandatory for everyone who is involved in the project ... quality assurance of all data on a regular basis (documentation controlling) .... even if that is not required by the owner\\\/buyer ... work-flow and elaboration due to internal documentation standards which were created specifically for this project ....<\\\/p>\\n\n\n<p><strong>as a result you will have the certainty that you<\\\/strong><\\\/p>\\n\n\n<ol>\\n\n\n<li>are able to deliver economical and high quality standard projects ...<\\\/li>\\n\n\n<li>are able to avoid additional coordination which is time consuming and cost intensive ...<\\\/li>\\n\n\n<li>are able to pass these standards on to our clients with a well balanced budget ...<\\\/li>\\n<\\\/ol>\\n<\\\/div>\\n<\\\/div>\\n<\\\/section>\",\"text_style\":\"\",\"text_align\":\"\",\"text_color\":\"\"}}]},{\"name\":\"\",\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"widths\":[\"\"],\"image\":\"wp-content\\\/uploads\\\/planning-accordion8-1.jpg\",\"image_width\":\"\",\"style\":\"\",\"image_size\":\"cover\"}}]}]},{\"name\":\"advantages\",\"type\":\"section\",\"props\":{\"width\":\"default\",\"padding\":\"\",\"style\":\"default\",\"header_overlay\":\"\",\"animation\":\"\",\"image_size\":\"cover\",\"image_position\":\"center-center\",\"vertical_align\":\"middle\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"title_breakpoint\":\"xl\",\"padding_remove_bottom\":false,\"padding_remove_top\":false,\"image\":\"\"},\"children\":[{\"name\":\"\",\"type\":\"row\",\"props\":{\"layout\":\",2-3\",\"gutter\":\"\",\"breakpoint\":\"m\",\"fixed_width\":\"large\"},\"children\":[{\"name\":\"\",\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"widths\":[\"\"],\"image\":\"wp-content\\\/uploads\\\/2017\\\/02\\\/compass.jpg\",\"image_size\":\"cover\"}},{\"name\":\"\",\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"widths\":[\"2-3\"],\"image\":\"\",\"image_width\":\"\",\"style\":\"\",\"image_size\":\"cover\"},\"children\":[{\"name\":\"\",\"type\":\"headline\",\"props\":{\"title_element\":\"h3\",\"title_style\":\"h3\",\"title_decoration\":\"\",\"text_align\":\"\",\"text_align_breakpoint\":\"\",\"text_align_fallback\":\"\",\"maxwidth\":\"\",\"maxwidth_align\":\"\",\"margin\":\"\",\"animation\":\"\",\"visibility\":\"\",\"content\":\"\n\n<div>\\\"The secret of getting ahead is getting started.\\\"<span style=\\\"font-size: 10pt;\\\">(Mark Twain)<\\\/span><\\\/div>\"}},{\"name\":\"\",\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Consider the needs of the future operation company and user, who will be forced to collect all necessary data by themself, troublesome and time consuming.<\\\/p>\",\"text_style\":\"lead\"}},{\"name\":\"\",\"type\":\"text\",\"props\":{\"margin\":\"default\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<section data-uk-grid-match=\\\"{target:'&gt; div &gt; .uk-panel'}\\\" data-uk-grid-margin=\\\"\\\">\\n\n\n<h4>isar1 ag ...<\\\/h4>\\n\n\n<ul>\\n\n\n<li>always supervises every project according to internal and\\\/or external documentation standards<\\\/li>\\n\n\n<li>always ensures a high quality of the issued documents trough internal QM standards<\\\/li>\\n\n\n<li>verifies and resolves the needs for the project documentation with the customer and adjusts flexibly to their requirements<\\\/li>\\n\n\n<li>creates CAD-, CAFM- and documentation guidelines on a 30 year experienced basis<\\\/li>\\n\n\n<li>organises, implements and coordinates a documentation management and controlling<\\\/li>\\n\n\n<li>optimises your relevant documentation processes<\\\/li>\\n\n\n<li>integrates supporting tools for planning an documentation<\\\/li>\\n\n\n<li>supports YOU in creating a documentation for existing buildings and already completed projects<\\\/li>\\n\n\n<li>solves organisational and IT-technical problems between all participants and the used tools<\\\/li>\\n\n\n<li>\\u2026.<\\\/li>\\n<\\\/ul>\\n<\\\/section>\",\"text_style\":\"\",\"text_align\":\"\",\"text_color\":\"\"}}]}]}]}]} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It should be self-evident that building projects have a proper and thoroughly documentation after their completion. Unfortunately our experiences in facility management show, that this is still an illusion for a large part of building projects until today\u2026. Documentation? What documentation? The reasons for an incomplete or lacking documentation: The documentation was not part of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":11032,"menu_order":2070,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-11250","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/pages\/11250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/comments?post=11250"}],"version-history":[{"count":0,"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/pages\/11250\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/pages\/11032"}],"wp:attachment":[{"href":"https:\/\/isar1.de\/en\/wp-json\/wp\/v2\/media?parent=11250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}